UNCLASSIFIED // PUBLIC. Student research and a testing instrument. Every Tainan facility, capacity and outcome shown here is SIMULATED or ILLUSTRATIVE unless a source is named beside it. Model boundaries

Tech Specs

Architecture

Build identity

Testing build CIRCUI-T 0.1.0-F2j. Terminal sha256 321020CB7A6D8A71B979E073B8780186F828900C31011F9707392E7CB65E62AA. Terminal size: 22.0 MB. A hash is tamper-evident identity, not authentication or a signature. Worksheet protection in exported workbooks prevents accidental edits; it is not data security.

Testing only. No release acceptance is claimed for any CIRCUI-T build. Status words on this site are claims and are used as the owner record grants them.

Lineage

CIRCUI-T builds on the BRACE Grid Resilience Terminal.

Engine

A single-file terminal (HTML, CSS, JavaScript) with a multi-commodity maximum-flow cascade (Edmonds-Karp) solved per commodity per day over a 91-day horizon. Eight commodities; compute solves last. Ranked tiers with incremental tier-lock solves; a two-pass residual allocator for the military reserve and single-site (monolithic) workloads. Stored commodities (oil, fuel, and gas when enabled) draw through a routed daily network with converter input, mission service and refill as three ordered draws. Repair is linear by default from the day after damage; NONREPAIRABLE assets never heal. Edges may carry a day range during which their capacity is zero (the PCC switch); any state field that changes a day's answer registers as time-varying so the static fast path is not taken. Placed coordinates are canonicalized to the centre of their one-metre MGRS cell.

Schema

Scenario workbook v18, reading v10 through v17 with guards; state v8; envelope v8; fingerprint v9. Product version and schema epochs are different numbers. The scenario fingerprint covers causal state including the stored-commodity set, the PUE multiplier, the toggle and PCC ranges; it excludes view state and the English names.

Tainan scenarios

The two Tainan layouts are embedded from scenario workbooks. The Sun Ba II setting includes or excludes the modeled addition. Source geometry is OpenStreetMap (ODbL); SIMULATED completion feeders join stations the mapping leaves unconnected, with their provenance in the scenario ledger. Infrastructure sources and scenario assumptions are listed on the Sources page; row-level citations and provenance flags travel with scenario exports.

Delivery

Libraries and fonts are served from this site, and the Content-Security-Policy in the site headers names every inline script hash. The only third-party requests are map tiles from tiles.stadiamaps.com and tile.openstreetmap.org, which the policy names; each carries only this site's origin as referrer. With no connection an online basemap falls back to No Basemap. The two scenarios are embedded in the terminal. Its measured file size is listed under Build identity. The Tainan scenarios exceed the browser's local autosave quota; the terminal says so and asks you to export before leaving. Scenario content never leaves your browser.

Known limits

Backup generators burn at rated rate from day 0 regardless of grid state; batteries deferred; no dispatch order in the solver. Fab process loads are SIMULATED corporate shares. Process gas at fabs is not modeled. The grid is a logical network. Tie-line generation is SIMULATED from a generic 345 kV rating and the national generation mix; the non-gas share available under blockade is an upper bound. Lines are bidirectional. No inferred cross-utility dependencies. Reachable sources are capability, not metering. Dependency Analysis sweeps nodes, not lines, one at a time, on the viewed day. The tier metric is a headcount of workloads at or above half service. No hour resolution, by decision.

Deferred to v1.1

Dispatch-aware fuel draw and battery dispatch; a first-class interdiction event kind; gateways and towers as electric loads; automatic islanding on upstream loss; a direct-to-device throughput lever; process gas at fabs; scenario persistence beyond the browser quota.

Verification record

Verification results for this build are not yet published on this page.

Results from earlier builds describe those builds, not this one, so they are not listed here.

Development and review

CIRCUI-T is developed from written prompts. A separate review checks a proposed build before the owner decides whether to accept it. AI tool output is treated as a claim until it is checked.