What This Terminal Is
A deterministic infrastructure model of a compute cluster and the utilities that feed it. Eight commodities (electric, water, gas, steam, oil, fuel, data, compute) flow from sources through substations and lines to delivery points; workloads at each delivery point declare what they consume. Data centers are converters: they take electricity, water and a data connection and produce compute, measured in IT-MW, and that compute travels over modeled compute links to the workloads that need it.
Load one of the two Tainan scenarios, or build your own. Right-click to author damage or a cyber effect, record a physical assessment on an asset, apply a facility template, open a microgrid's point of common coupling for a range of days, then scrub the 90-day timeline: LNG inventories count down, gas plants stop when their store is empty, backup generators burn through their stock, repair episodes accrue, and every workload reports whether it is GOOD, DEGRADED, DOWN or IDLE. The complete scenario workbook carries causal and audit state, dated events, catalog snapshots and the display-only view day.
Data honesty: every number is tagged CITED, SELF-DERIVED, ILLUSTRATIVE or SIMULATED. In the Tainan scenarios the plants, stations and lines come from OpenStreetMap and public sources; every data center, service delivery point and connection assumption is SIMULATED and says so in its source field. The grid is a logical network completed with SIMULATED feeders where public mapping is incomplete.
Names on the map. Map labels and hover names are English display names in every tab: an operator's published English name where one exists, otherwise OpenStreetMap's English or Latin name, otherwise SELF-DERIVED English (a translation, English already in the scenario data, a composed name or OSM tags). Labels drop the bracketed source tags; the map's source line states the sources. The original names, with their tags, are unchanged and remain each record's Name, used by lines, plays and timeline rows and shown in Build's DATA editor and the exported workbook.
Local data and privacy. The Tainan scenarios are larger than this browser's local storage can hold, so autosave is unavailable for them and the terminal says so; export a workbook before you leave or reload. Smaller scenarios autosave to local storage in plaintext. CIRCUI-T does not upload scenario content. Libraries and fonts load only from this site's origin. Online basemap tiles come from Stadia Maps or OpenStreetMap; each tile request gives that provider your network address, this site's address and the map area in view, never scenario content. Without a connection an online basemap falls back to No Basemap, and every overlay still works. Local storage and exported workbooks are not encrypted and may become sensitive when populated. Handle them under local guidance.
How To
CIRCUI-T asks one question: if part of a compute cluster loses electricity, water, gas, data or another supply, which workloads are affected, for how long, and can the military-reserve share of the cluster still be served? Load a Tainan scenario and build on it with the chain below, add a disruption or import a play, move the Campaign Clock, and read the result at the workloads.
A typical model chain: Source, then Substation or Store, then Line, then Data center (converter), then Delivery point, then Workload.
Three things are worth knowing before you start. First, tiers: workloads are Military reserve, Critical civil or Commercial, served in that order, and each data center holds back a percentage of its compute that only Military reserve workloads may use. A workload marked single-site must fit within one data center's reserve or it is short. Second, the tier bar counts workloads at or above half service; it is not a percentage of demand met, and a workload whose data is cut counts as unserved even when its compute was allocated. Third, backup generators run from day 0 and empty within their rated hours whether or not the grid is up; that is the engine's convention, and the honesty note on the home page explains it.
A typical model chain: Source→Substation or Store→Line→Data center (converter)→Delivery point→Workload
- GOOD — all declared supply demands are effectively met.
- DEGRADED — at least one declared demand is not fully met, and no critical demand is fully unmet.
- DOWN — at least one critical demand is fully unmet.
- IDLE — no supply demand is entered.
Explore the Loaded Scenario8 Steps
Goal: Learn what CIRCUI-T shows before trying to build anything.
-
Start with the loaded scenario. Opened from the CIRCUI-T site, or with ?scenario=consolidation or ?scenario=fragmentation in the address, the terminal loads that CIRCUI-T Tainan layout in Facilitate mode. With no scenario in the address, it loads CIRCUI-T Tainan - Consolidation in Facilitate mode, in place of any local autosave. If saved work or another scenario is open, select Export under Scenario first if needed, then open Scenario Select and choose the scenario you want.
Expected: The map shows the Tainan Consolidation layout rather than an empty canvas.
-
Read the screen from the map to the missions. Colored nodes and lines show the infrastructure that carries supplies. Missions shows the activities that declare demand for those supplies. Event Log shows what has happened by campaign day.
Expected: You can trace infrastructure on the map to the mission cards and dated event record.
-
Simplify the map. Under Overlays, leave Electric visible and temporarily hide the other utilities.
Expected: Only the electric network remains visible. Hiding a utility changes the display only; the model still counts it.
-
Check the starting condition. Set the Campaign Clock to D+0 and inspect several mission cards for their importance tier, declared supply needs, and visual status. The Event Log header summarizes GOOD, DEGRADED, and DOWN missions.
Expected: Missions are served in tier order: Military, then Civil, then Commercial. For compute, Military missions draw only on each data center's reserve share, so a Military mission can be short while Civil missions are fully served.
-
Ask what matters most. Move the Campaign Clock to D+5, open ANALYSIS, and select Run Analysis. With the default filters, the first Ranked Results row is the highest-ranked modeled single-node outage at the selected day.
Expected: CIRCUI-T removes each eligible node as a fresh full outage, one at a time, and ranks the modeled consequence; this read-only, SIMULATED sweep bypasses hardening, does not change the scenario, and is not an engineering prediction, strike forecast, or targeting recommendation.
-
Try one modeled disruption. On the first Ranked Results row, select Show on Map. CIRCUI-T returns to the map and highlights the node. Right-click that node, keep Kinetic, Quantity 1, and Exact (externally adjudicated), then select Apply Strike.
Expected: Exact places every authored round at the selected aimpoint and normal effect rings can still affect nearby assets; it does not model weapon reach, reliability, interception, or duds, while CEP creates deterministic circular-normal SIMULATED impact locations and is not a hard boundary.
-
Follow the result. Check the mission cards and Event Log, then open TIMELINE in its default Review mode. Move the Campaign Clock to just before, on, and after D+5 and inspect Mission Trajectory and Mission & Asset Effects.
Expected: Observe whether the strike changes a mission or asset and, if it does, how modeled repair evolves. A Quantity 1 strike is not the same experiment as Dependency Analysis's full outage, so the result may be no mission change, DEGRADED, DOWN, recovery to GOOD, or NO RECOVERY within D+90.
-
Reset safely. Use Ctrl/Cmd+Z to undo the practice strike, or choose the loaded scenario again in Scenario Select and confirm the full-scenario replacement. Export first if you need the current work.
Expected: Undo removes only the last scenario mutation; reloading the default replaces the whole scenario and clears Undo.
What you learned: The map shows where supply travels, Dependency Analysis identifies modeled weak points, and the Timeline shows whether and when mission consequences begin and recover.
Facilitate mode
The terminal has two modes. The MAP, HELP, DATA, TIMELINE and ANALYSIS tabs are the full editor. Facilitate is the projected screen for a facilitated group: it shows the same map, timeline and results, and hides every control that builds or edits a scenario. Nothing is computed differently in Facilitate; both modes read the same 91-day timeline.
Facilitate opens automatically when a CIRCUI-T Tainan scenario loads, the bare address included, and opens in the dark theme unless a theme was already chosen in this browser session. The FACILITATE tab returns to this screen from any other tab; the other tabs are the editor's views and stay light. The sun and moon buttons at the right end of the tab bar switch Facilitate between light and dark; the choice lasts for the browser session and survives a scenario reload. The tab bar stays in view in the Standard, Window and Full display modes. To apply a strike or a cyber effect, open TIMELINE, add it under Manage Events and apply it, then return to FACILITATE; the Facilitate screen follows.
The play deck fires one play at a time. A play is the baseline scenario plus one change, imported as a complete scenario, so firing a second play replaces the first; Reset to baseline reloads the layout. Combined plays are run in sequence, one after another, until stacked plays arrive in a later build. After a play fires, the clock returns to D+0 and Run to next event steps to the play's first event day. In Facilitate the timeline card is the only day control; the map's own scrubber is hidden.
Map labels in Facilitate follow a fixed priority: data center campuses at every zoom, then one label for each fab group, then major plants and hubs (the 345 kV stations, the Fangshan landing and the CHT Tainan IDC), then everything else as you zoom in. Labels are placed so they do not overlap; where two would collide, the lower-priority label is left off, and pointing at a marker shows its name. Electric sources and backups under 25 MW are not drawn in Facilitate, to cut clutter. They stay in the model and in every result, the map footer counts them, and anything placed from a template or damaged on the day shown is always drawn.
Site health reads each data center's inputs from the engine's daily results: Power is the share of its electric input received, Water the share of its water input, Comms the share of its data input. Green is full supply, yellow is partial supply, red is none, grey is a destroyed site with its days to repair. Water is a degrading input in the Tainan scenarios, so it can turn a site yellow but never red on its own. The thresholds are SELF-DERIVED until the exercise group ratifies them; the panel header says so.
Readouts show compute served against compute demanded for each tier the scenario defines, in IT-MW, as a fraction and a bar; workloads whose delivery point has been removed are excluded and counted in the footer. This is a different measure from the tier bar in Build, which counts workloads at or above half service. LNG days remaining is the store's closing level divided by that day's net draw (draw less refill); it reads "steady" when refill covers the draw and "—" when there is no draw. It is a display formula, SELF-DERIVED, and does not feed the model. Power mix shows the electric source capacity available on the selected day by fuel, gas against everything else; it is capacity that could be dispatched, not output delivered, and it is SELF-DERIVED from the scenario's source ratings.
Data delivered reads the same daily results as compute served: for each tier, the data that reached its workloads against the data they demand, in Gbps, with orphaned workloads excluded. The Comms dot on a site tile reads only the campus's own data link, so a cable cut can leave every tile green while workloads go short; this readout is where that shows. A workload can have its compute allocated and still be short of data. The data demands are ILLUSTRATIVE.
Controls — Mouse & Keys
Left-Click an Asset
Opens its editor popup — physical assessment, capacity, and governed repair details. Clicking on or near a node always selects the node; lines are clickable along their open run.
Right-Click the Map
Opens attack authoring at that point (on touch screens, long-press instead). Exact placement is externally adjudicated; CEP dispersion is SIMULATED.
Hover a Node
Reveals its label.
Drag a Node or Site
Repositions it; the cascade re-solves immediately.
Press-and-Drag a Line
Births a routing waypoint and bends the line around terrain; a plain click still opens the line's editor.
Draw Line (Rail)
Click the start asset, then the destination.
Date Bar ‹ ›
Step the sim clock one day back / forward.
Date Bar Slider
Scrub the timeline, D+0 through D+90 — map, missions, and ledger update instantly.
Click the DTG Readout
Set the scenario's start date-time (Zulu).
Drag the Event Log Band
Resizes the console split — pull down for more missions, up for more event history.
Drag ⋮⋮ on a Mission Card
Reorders priority within its tier; drag a site header to reorder sites; click a card to edit its supplies.
Layers Checkbox / ▸ Arrow
Shows or hides a utility / opens its per-level filters (generation, substations, storage, fallbacks, lines) — display-only, the model still counts hidden assets.
Marker Size
Node markers scale with rated size (√ scale, normalized per utility): generation and tank size directly, substations by the rated capacity wired to them. Display-only — the solver ignores marker size; lines never scale.
Ctrl/Cmd+Z
Undo — covers validated scenario mutations including topology, attacks, physical assessments, and repair edits.
Ctrl/Cmd+Shift+Z or Ctrl/Cmd+Y
Redo.
Esc
Closes the topmost popup, editor, or pull-down panel and restores focus to its launcher.
Wheel / Pinch / +−
Zooms the map; drag open water to pan.
Repair Estimation
Each repairable asset resolves to a governed repair profile or a reviewed local override. The current execution separates the selected damage band, construction delay, active-work duration, and functional-throughput behavior:
Damage Band
Built-in profiles use a standard band below the SELF-DERIVED 95% policy boundary and a complete-rebuild band from 95–100%; exactly 95% selects complete rebuild. The selected band locks for that repair episode.
Construction Delay
Long-lead repair enables a separate Construction Delay (Days). No repair work accrues on the damage day or during that delay; active work begins on the following day.
Active-Work Duration
Days are defined at 100% physical loss. Partial loss requires the proportional share of that modeled duration.
Functional Throughput
Linear throughput follows physical repair. Broken until threshold, then linear provides no modeled throughput until its governed share of episode work is complete, then ramps linearly.
New Damage or Assessment
A re-strike destroys repaired work point-for-point and deterministically rebases the episode. An authoritative physical assessment applies after same-day strikes and restarts repair from the assessed condition.
Nonrepairable
NONREPAIRABLE assets do not restore inside the 90-day horizon.
The Repair Catalog carries stable profile and band IDs, derivation, provenance, confidence, and source evidence. A CITED event remains a cited anchor only for that event; transfer or scaling to another class is SELF-DERIVED, source-lacking assumptions remain ILLUSTRATIVE, and scenario results are SIMULATED. Adoption previews the linked-asset impact, preserves reviewed overrides, and applies transactionally.
Click an asset → Edit Repair Details to inspect or stage repair mode, a governed library estimate, active-work days, long-lead status and construction delay, provenance, throughput authority and style, and physical-damage scaling. A local repair-style override requires an entered review reason; other direct repair edits are recorded as local overrides. Apply commits the staged details together as one Undo step.
Timeline, Dependency Analysis & the Data Editor (Pull-Downs)
The tab bar holds FACILITATE, MAP and four pull-down panels: HELP, DATA, TIMELINE and ANALYSIS. One pull-down opens at a time.
Timeline
The 90-day engagement view draws every dated kinetic, authoritative physical assessment, legacy damage, and cyber event as a tri-state recovery trace for affected missions and assets. A physical assessment applies after same-day strikes, may lower or raise modeled loss, and restarts repair from the assessed condition; event changes commit atomically.
Dependency Analysis
The day-local sensitivity sweep removes each eligible node in isolation at the selected campaign day and ranks the effect on tiered missions and commodity coverage. It is read-only and SIMULATED and never writes back to the scenario.
Data
The scenario data editor changes human-facing fields for assets, sites, missions, lines, attacks, references, and scenario settings. Every change stages and commits through the same validated workbook round-trip path; connections are still drawn on the map.
Scenario & Data Files
The DATA panel provides the scenario editor, complete scenario import/export, the two Tainan scenario workbooks and twelve plays. Governed current-format scenario and questionnaire imports validate before one transactional apply; stale or incompatible governed contracts do not partially mutate the live scenario.
Protect populated files. Scenario workbooks can contain installation locations, capacities, mission relationships, cyber assessments, and planned effects. Sheet locks prevent accidental edits only; they are not encryption or a security boundary. Handle populated files under local guidance.
Request a Feature or Report a Bug
A short email is the most reliable way to send feedback from this static tool. For a useful report, please include:
- Bug or feature request, plus the outcome you wanted.
- What you expected and what happened, including any visible error message.
- Steps to reproduce the problem, or the workflow the proposed feature would improve.
- CIRCUI-T version, browser/device, and display mode (Standard, Window, or Full).
- A cropped screenshot when it helps show the issue.
Protect operational data. Do not email classified, CUI, sensitive installation information, populated scenario workbooks, or screenshots containing nonpublic infrastructure details. Sanitize and crop attachments before sending.
Or email Ben.Dodge@usnwc.edu with the subject CIRCUI-T Tool feedback. Attachments are added in your email app; CIRCUI-T does not upload them.